top of page

PROJECTS  IN PROGRESS

CASTAIC LIBRARY RENOVATION

 

A design-build project, the Castaic Library  is a Los Angeles County Library branch  located in Castaic, CA.  The county library was leasing 6,985 sq. ft. in a Castaic Retail Center.

The new 12,250 sq. ft. library will be located in the same retail center in a stand-alone building that will have complete interior and exterior renovations.  The library improvements will include a public meeting room for 115 occupants, group study rooms, a teen library with gaming zone and a children's library with family area.  Other improvements  include increased seating for studying, reading and relaxing, new public computer workstations and three express self-checkout station. Construction is scheduled for completion in September 2014.

 

 

 

 

STEVENSON RANCH LIBRARY RENOVATION

 

CWA AIA, Inc. is the Design Architect and is working with JTC  Architects, Inc. to provide design services for Stevenson Ranch Library; a Los Angeles County Library branch located in Stevenson Ranch, CA.  The new 11,551 sq. ft. library will include a public meeting room for 90 occupants, group study rooms, a teen area and a children's library with family area and discovery zone learning center.  Other improvements  include increased seating for studying, reading and relaxing, new public computer workstations and three express self-checkout station. Construction is scheduled for completion in January 2015.

 

 

 

 

 

SALEM LUTHERAN CHURCH RENOVATION

 

The Salem Luther Church Renovation / Improvements project is to upgrade the1958 church and surrounding buildings to current accessibility and technology requirements. The project includes new visible accessible entry from the public way, a new exterior three-stop elevator tower with bridge and walkways to make all church and campus levels accessible. The sanctuary and church improvements include a movable central altar-area, new movable seating for flexibility and moving the choir area to front of church. Technology improvements include; new lighting and audio-video systems for the church. Construction is scheduled to start in July 2014.

 

 

 

 

 


 
bottom of page